Category
IEC61238
CAL A copper aluminum bimetal cable lug Material: E-Cu; Al-99.6% Technical Requirements: 1.Due to the coupling effect wh
Basic Info.
Model NO. | DTL-2 |
Shape | Tubular |
Interface Type | Crimping |
Certification | SGS |
Brand | Ruifeng |
Delivery Time | 3-5 Working Days |
Customized | Accept |
Delivery Term | Express,Air Fright, Sea Freight |
Application Place | Conduct Electricity |
The Number of Holes | 1 |
Inventory Quantity | 10000 |
Availability of Goods | Conduct Electricity |
Shape Type | Round |
Standard | IEC61238-1 |
Techniqueof Production | Friction Welding |
Function | Waterproof Dustproof |
MOQ | 1000PCS |
Sample | Free |
Finished | Acid Cleaning |
OEM | Accept |
Transport Package | 1.Standard Carton Box 2.Pallet 3packing on Request |
Specification | 16-630mm2 |
Trademark | RuiFeng |
Origin | Zhejiang, China (Mainland) |
Production Capacity | 300000 Piece/Pieces Per Month |
Product Description
CAL A copper aluminum bimetal cable lugMaterial:
E-Cu; Al-99.6%
Technical Requirements:
1.Due to the coupling effect when Aluminum Comes in contact with copper, corrosion will happen in the short time.The best solution is to use aluminum-copper bimetal connectors. It is according with IEC 61238-1.2.The transition section between aluminum and copper is produced by friction welding, bending 180°,no breaking weld.3.The marking should be clearly, well-proportioned with the depth of 3mm;4.Closed angle and edge curl are not allowed at the mouth of the pipe.
Type No | Main Dimensions(mm) | ||||
Φ | D | d | L | L1 | |
CAL-16A | 11 | 16 | 5.5 | 83 | 42 |
CAL-25A | 11 | 16 | 6.5 | 83 | 42 |
CAL-35A | 11 | 16 | 8 | 83 | 42 |
CAL-50A | 13 | 20 | 9 | 90 | 43 |
CAL-70A | 13 | 20 | 11 | 90 | 43 |
CAL-95A | 13 | 20 | 12.5 | 90 | 43 |
CAL-120A | 13 | 25 | 13.5 | 115 | 60 |
CAL-150A | 13 | 25 | 15.5 | 115 | 60 |
CAL-185A | 13 | 32 | 17.5 | 125 | 60 |
CAL-240A | 13 | 32 | 19.5 | 125 | 60 |
CAL-300A | 13 | 34 | 22.5 | 135 | 62 |
FAQ
1. How to buy your ideal products?
A: You can provide us your drawings, and we will produce it as per your drawings. Or we can design it if you do not have a clear plan.
2. How to pay?
A: TT and L/C are acceptable and TT will be more appreciated.30% deposit before producing, 70% balance before loading by TT.
3. What is the delivery time?
A: It depends on order quantity. Generally, the delivery time will be within 15 to 30 days.
4. Package information
A:For inner box and master carton are made as per international standards, and we can make special designed for you if need. And if necessary, will be packed in pallet to avoid any damage.
B:Not more than 35kg per carton box, about 1000kg per pallet
5.How long to make a sample? Is it free?
A:7 days depending on the sample's complexity. Normally, our sample is free
6.How to cantact us?
A:Send your inquiry details in the below, Click "send" now!
Our Services
Service
1.Thousands of products in stock and ready to ship.
2.The most competitive pricing
3.Free shipment container loading
4.Putting the customer's needs first, always
5.On call,24 hours a day,7 days a week